Tronox contracted Obsideo for the bulk materials handling detail design associated with the expansion of Namaka Sands East Mine. The scope of work included the relocation of a 2.2km trunk conveyor, a new optimized Tailings Handling Facility (THF), a feed conveyor to the THF, an extension of the 4.7km Dual Carry Conveyor (DCC) as well as the transfer towers from the trunk conveyor onto the DCC and from the DCC onto the THF feed conveyor. The design also encompasses the electrical MV expansion including various mini substations to distribute power to each of the new remotely located drives.